Renewable Energy with a focus on:
(Until 2022)
a)
Main Supervisor – PhD
Bil. |
Tajuk |
Nama Seliaan / Organisasi |
Pengajian |
Tempoh Penyeliaan |
1. |
Energy Resilence during Flood Disaster with the aid of
Solar Technologies: A Case Study of FELDA’s Communities |
Siti Jamiah Tun Jamil/UiTM |
PhD (AP992) |
2016 – 2022 (Passed viva
with minor correction) |
2. |
Adopting
Housing Design towards Smart Grid System in Malaysia |
Ahmad
Haqqi Nazali/UiTM |
PhD (AP991) |
2018-ongoing |
3. |
Defect Building Management Framework
for Public Universities in Malaysia |
Zaimah
Zainal Abidin |
PhD (AP991) |
2022 - ongoing |
4. |
Green
Retrofitting for Rural Houses in China |
Tian
Congxiang |
PhD (AP991) |
2023 – ongoing (International Student) |
a)
Main Supervisor -
Master
Bil. |
Tajuk |
Nama Seliaan / Organisasi |
Pengajian |
Tempoh Penyeliaan |
1. |
Green Electricity: A Feasibility Study of Solar
Electrification for PDRM |
Md Hafiz Mat Yasin / PDRM |
MSc |
2015 – 2016 (Graduated on Time) |
2. |
Optimum Lighting Strategies towards Green Studios in UiTM Perak |
Muhammad Anas bin Othman/ UiTM Perak |
MSc |
2016 – 2019 (Graduated) |
3. |
Energy Audit for Malaysian Universities: Towards Energy
Efficiency Performance in UiTM Tapah |
Mohammad Hilmi Dzulkefli/Global FM |
MSc |
2016 – 2020 |
4. |
Humidity-based
Defect in University’s Accommodation |
Zaimah
Zainal Abidin |
MSc |
2018-2021 (Graduated) |
5. |
Solar Lighting Technology for
Improving Safety Level at Public Mosque in Perak Tengah |
Nur Alia Tasnim |
MSc |
2023 – Graduated on Time |
6. |
Significance
House Elements towards Smart Home Appliances Adaptation in Cyberjaya |
Ahmad
bin Azmin |
MSc |
2021 - ongoing |
7. |
The Engagement Level of Orang
Asli Communities for Solar Technologies in Achieving Safety for the Community |
Sufiyah Ismail |
MSc |
2023 - Ongoing |
b) Co-Supervisor – PhD
Bil. |
Tajuk |
Nama Seliaan / Organisasi |
Pengajian |
Tempoh Penyeliaan |
8. |
Defect Management Model with the Integration of Green
Technology |
Ahmad Muaz/UiTM |
PhD |
2020 – ongoing |
9. |
Non-Technical Barriers for Residential Ownerships in Renewable Energy
Projects |
Mohammad
Bakri/TNB |
DBA |
2020-ongoing |
c) Co-Supervisor – Master
Bil. |
Tajuk |
Nama Seliaan / Organisasi |
Pengajian |
Tempoh Penyeliaan |
10. |
The Influence of sun shading
devices in reducing solar heat gain |
Khairul Azmi bin Mohamed/Politeknik
Ipoh |
MSc |
2017 - 2021 (Graduated) |
11. |
Energy Performance through BIM Adoption in UiTM Tapah |
Ahmad Firdaus |
MSc |
2018-2022 (Graduated) |
12. |
Facilities Management for GBI
Building with Solar Energy Application |
Muhammad Iqbal Abdullah |
MSc |
2022/2023 (Graduated) |
2023
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 30 units -
Green Technology Projects for Puncak Iskandar Residential Area (Volume 2.0),
collaboration with Majlis Daerah Perak Tengah (MDPT), UiTM and Puncak Iskandar
Community
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 15 units -
Green Technology Projects for Sek Keb Sg Kiol in Jerantut, Pahang (2023), collaboration
with JAKOA Pahang
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 10 units -
Green Technology Projects for Ecotourism Centre in Kg Orang Asli Tonggan, Ulu
Kinta, Perak (2023), collaboration with JAKOA Perak
2022
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 30 units -
Green Technology Projects for Puncak Iskandar Residential Area, collaboration
with Majlis Daerah Perak Tengah (MDPT), UiTM and Puncak Iskandar Community
2021
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 15 units -
Green Technology Projects for Sek Keb Chopin in Parit, Perak (2021), collaboration
with PPD Perak Tengah
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 7 units - Green
Technology Projects for Sek Keb Seri Iskandar in Seri Iskandar, Perak (2021),
collaboration with PPD Perak Tengah
2020
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) 2 units - Green
Technology Projects for Surau Al-Munawarrah, Puncak Iskandar in Seri Iskandar,
Perak (2020)
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) - Green
Technology Projects for UiTM Perak Entrance Lake in Seri Iskandar Campus, Perak
(2020)
2019
§
Installation
of Solar Photovoltaic Panels For Lighting Systems (1 kW system) - Green
Technology Projects for Maahad Tahfiz Addnin 2 (MTQ-2) in Parit, Perak (2019)
§
Installation
of Solar Photovoltaic Panels for USB Charging Hub and Lighting Systems (600 W
system) – For MRSM Lenggong in Perak (2019)
§
Installation
of Solar Photovoltaic Panels for USB Charging Hub and Lighting Systems (600 W
system) – For Masjid Bandar University in Seri Iskandar, Perak (2019)
2018
§
Installation
of Rain Water Harvesting System (RWHS) for Fertigation Farm at MRSM Lenggong in
Perak (2018)
2017
Visit Link:
and
https://www.scopus.com/authid/detail.uri?authorId=57190857876
2023 List of Publications:
1 comment:
اصدار عقد نظافه الكتروني معتمد
Post a Comment